Friday, 2 September 2011

Bring on the Wind!

We had good intentions of sending off our alpaca fibre for spinning at the start of the summer but have only recently got round to it. We should get it back in the next couple of weeks ready to be knitted up. All our other wool that we had has been made into products and we are just considering whether to sell it on-line or in some of the local tourist shops or perhaps both. Anyway, here are a few of the items we have but are still experimenting with some other patterns.


As we hadn't had a summer holiday for the last few years we decided to treat the kids (and ourselves) to a week at Disneyland Paris. It was fab and brought a lot of memories back for Anne who worked there for 2 years in what was supposed to be a summer job while at Uni. It was a lot of walking and of course a lot of €'s but worth it. Anne's already looking at brochures for next years holiday!


We've had loads of enquires about how our C&F Green Energy CF11 wind turbine is doing. We discovered early on that there was an issue with high voltage on our grid supply which was being caused by the transformer we were connected to. C&F worked out and configured us to run at 50% (6kW max) without pushing the voltage too high until SSE replaced the transformer. Despite this, in our first 3 months we still generated about 4000kWh (would have been 8000kWh had we not had the 50% restriction). I'm happy to say now that SSE have upgraded the transformer and we are back on track to achieving our expected generation or maybe even exceeding it. We'll have a better idea after the winter.